Gas tank, handle bars, transmission, and engine mounts are added to frame.
2 / 22
Front forks, oil tank, floor boards added.
3 / 22
Engine completely rebuilt.
4 / 22
Engine installed in frame.
5 / 22
Exhaust system and shift levers added.
6 / 22
Tail light, rear fender and brackets added.
7 / 22
Primary chain cover, handle bars and grips added.
8 / 22
Rear fender, springs, and chain guard added to frame.
9 / 22
Now that the bike has been put together and all parts fitted, the bike was totally dismantled and the newly painted parts are being refitted for the final assembly. This photo shows the right side with gas tank and tool box fitted. The Indian logo decals add a respective finishing touch. (Right side)
10 / 22
Left side showing refitted front forks and battery box.
11 / 22
Rear fender and tail light after paint are fitted to the bike.
12 / 22
Front suspension fitted. Project ready for installation of the front fender.
13 / 22
Front fender and fender tip in place.
14 / 22
Front fender struts ,brackets and wheel in place.
15 / 22
Respoked wheels, new tires, and seat added.
16 / 22
Right side showing front fender and speedometer added.
17 / 22
Almost complete and ready for paint.
18 / 22
Handle bars and seat make the project look close to completion.
19 / 22
All the seat parts had to be separated, polished, plated and reassembled.